So you’ve tried aerification, top-dressing, and deep-tining and didn’t get
the results you wanted? It’s time to improve your greens with a drainage
system. Our drainage will remove ground water and help water flow without
the extensive cost and down time of rebuilding your green. Plus you can
get the added benefits of firmer greens and lower soil temperatures in
the summer which can result in better playing conditions.


How It Works

LAYOUT

The process begins by surveying the site. Once the contour and outlet
direction is determined, the drainage design is established on 6‘ centers
to provide consistent drainage throughout the green. (click on images)

PROCESS

The sod is removed by hand in 7” x 15” strips and plywood is placed before
trenching. The spoils are removed and grade is checked before installing the
2” perforated pipe with micro-slits to depths of 15-16”. The pipe is covered
by a 6-2-2 greens mix that helps direct the water into the system.

FINISH

After the mix is tamped in place, the sod is returned to it’s exact location
to prevent shrinkage. The sod is tamped level and the green is cleaned with
blowers. The green is immediately ready to roll, mow, and play. The finished
product is extraordinary and normally takes 1-2 days. Our specialists make
fast golf course drainage systems for every golf course.